Hoopa Valley Aggregates
and
Ready Mix Enterprises
PO Box 789
Hoopa CA 95546
Telephone (530) 625.4017
Fax (530) 625.4021

Kevin Orcutt, Roads Director/ Lead Foreman
Leslie Sanders, Administrative Manager/ Records Manager
Warren Tamerius, Transportation Planner
There are currently two production sites. The cement
plant is located in Salyer, California and the aggregate plant is located
at the Cal-Pac site, south Highway 96 in Hoopa. Please contact the Hoopa
office listed above for pricing and further information.
RATES
Effective May 2008
| Aggregate |
Price
Per Ton |
3/4" Crush Base
|
$10.50 |
1 1/2" Crush Base |
$12.00 |
1/2" Crushed Rock |
$12.00 |
| 3/4" Crushed Rock |
$12.00 |
| 1" Crushed Rock |
$12.00 |
| River Run |
$9.00 |
| 1 1/2-2" Drain Rock |
$12.00 |
| 2" Drain Rock |
$12.00 |
| 4" Drain Rock |
$12.00 |
3/4" Washed Rock (Cement) |
$12.00 |
| 3/8" Pea Rock (Washed) |
$12.00 |
| 1' Cobble |
$20.00 |
| Unsorted Cobble |
$18.00 |
| Washed Sand |
$18.00 |
| Crusher Sand |
$10.00 |
| Reject Sand |
$12.00 |
| 1'-2' River Rock (1/4 Ton) |
$25.00 |
2'-3' River Rock (3/4-1 Ton) |
$35.00 |
| Top Soil Additive (Sand/Clay) |
$8.50 |
| Pit Run |
$9.00 |
| Rip Rap 1/4 Ton |
$25.00 |
| Rip Rap 1/2 Ton |
$25.00 |
| Rip Rap 1 Ton |
$25.00 |
| Rip Rap 2 Ton |
$25.00 |

Roads/Aggregate cuts the
ribbon on a new
development enterprise

From Left to Right
(John Marshall, Melvin Marshall, Jim Ammon, Jeff Hodge,
Chairman Lyle Marshall, Senator Wes Chesbro, Jack Ammon, Jacque Hostler,
Lonnie Colegrove, NOT PICTURED: Arthur Jones, Martin
Swenson, Gary Dempewolf, Kevin Orcutt, Clyde Moon)
|